Skip to main content

FL Smidth wins Pakistan cement plant order

May 30, 2017

FL Smidth is to deliver a complete cement production line to Power Cement in Pakistan.

The order from Power Cement, part of the Arif Habib Group in Pakistan, is for engineering, procurement and supply of equipment for a 7,700 tonnes per day production line comprising two projects; clinker production and cement production & dispatch.

The new production line will expand the two existing lines located in Nooriabad north-east of Karachi, Pakistan. The order includes crushing, packing and cement loading equipment.

"The new production line underlines FL Smidth's strong position in Pakistan,” Per Mejnert Kristensen, group executive vice president, cement division, FL Smidth, says. “It will emphasise the value of a highly efficient modern cement plant with minimised environmental impact and our state of the art quality control system for cement.

“We look forward to cooperating with Power Cement and the Arif Habib Group, which is considered to be one of the leading groups in Pakistan,” he says.

Key facts

  • Total order size: more than $100m
  • Scope: a complete cement production line with the environmental pollution control systems and technology for energy efficiency and maintainability
  • Equipment: Atox 55 vertical mill for raw grinding, Atox 25 vertical mill for coal grinding, EV(TM) 250x250 hammer impact crusher, stacker and reclaimer systems for storage, Rotax-2 rotary kiln with low NOx ILC calciner, Jetflex burner prepared for future refuse derived fuel, FL Smidth Cross-Bar cooler, and two OK(TM) 39-4 vertical mills for cement grinding
  • Capacity: 7,700 tonnes per day
  • Customer: Power Cement
  • Geography: Nooriabad, Pakistan
boombox1
boombox2