The process makes effective use of waste rock extracted during the mining process by reusing it as aggregate within the backfill mix.
Kasco utilised a cemented rockfill as the backfill type, whereby waste rock is mixed with a cement slurry to improve the bond strength between the fragments of rock.
The cemented rockfill contains cement slurry concentrations at typically 55% by weight and a mixture of coarse (<150mm) and fine (<10mm) aggregates. In this application, the Rapidmix 400 CW plant mixed a pre-graded aggregate, cement and water to produce the backfill.
Using its own fleet of Volvo dump trucks alongside the Rapidmix 400CW, which has outputs of 400tonnes/hour, Kasco completed the backfill process faster, resulting in saved time, manpower and money.
Fully mobile and self-contained, the Rapidmix 400CW is powered by its own power source, with on-board compressor and generator, and is fitted with a self-erecting system that means the plant can change from travel mode to fully operational within a few hours.