At its high-volume asphalt facility in Hayes, UK, Tarmac has successfully integrated a state-of-the-art hot recycling drum plant into its operations. The Benninghoven RAP pre-dryer at the site, west of London, is currently capable of using up to 50% RAP material and processes road planings removed from nearby areas for use on local roads. Processed RAP is introduced at a constant speed to the Benninghoven system and is dried and heated at approximately 120°C in a uniflow largevolume drying drum equipped wit